Category


Education

SUNY University at Buffalo: 77 Goodell Exterior Signage

The University at Buffalo engaged HHL Architects to provide design services for establishing exterior signage guidelines for the building at 77 Goodell. At the time, the building housed private tenants, governmental agencies and the University at Buffalo Regional Institute. HHL Architects selected Hadley Exhibits to provide consultation.

SUNY Geneseo: Sturges Hall Roof Replacement

HHL Architects was engaged by the State University Construction Fund to design the replacement of the lead-coated copper roof on this historic landmark campus classroom and administrative building. The roof was completely replaced with a matching standing-seam roof while gutters and flashings were corrected and repaired; new snow and ice guards were added to the..

SUNY Geneseo: Academic Master Plan

HHL Architects was engaged by the college to develop a long-range plan for the expansion, renovation, and utilization of the entire academic space on campus. HHL teamed with Scott Blackwell Page and Rickes Associates to evaluate the current facility conditions. The team also met with administration and faculty to project the classroom and other teaching..

SUNY College at Buffalo: Rockwell Hall Theatre Upgrades

SUNY College at Buffalo: Rockwell Hall Theatre Upgrades

The project team began with a preliminary study developed with the input of theater consultants and engineers to assess the needed performance and environmental upgrades. HHL Architects designed enhancements to the auditorium including improvements to stage rigging, lighting, power and flooring upgrades, proscenium fire curtain, house lighting and power upgrades, sound system and assistive listening..

SUNY Brockport: Tower Fine Arts, Smith & Edwards Hall Phasing Study

HHL Architects was engaged to produce a study evaluating and recommending a construction phasing plan for infrastructure renovations required for three campus buildings. A strategy was developed to incrementally shut down sections of each building for renovations and identify other buildings on campus deemed suitable for “swing space” to relocate departments and functions during the..

Medaille Elementary School

The Medaille Elementary School is a one-story structure on a campus of school buildings which includes Mt. St. Joseph’s Academy and Medaille College. The building is linked to adjacent buildings but makes a distinct departure architecturally because of its scale and layout. The school incorporates open classrooms for team teaching. The circulation space is centralized..

Elmwood Village Charter School

HHL Architects designed the renovation of an outdated, abandoned Buffalo Public School, built in 1956, for the expansion of the Elmwood Village Charter School. Interior and exterior updates were implemented as well as the design of a canopy over the main entrance to delineate the new pick-up and drop-off zone. Other work that was performed..

Cornell University: Industrial Labor Relations @ Market Arcade

The Cornell Industrial Labor Relations department was relocated into a renovated office suite in the historic Market Arcade building in Buffalo, NY. The renovation consisted of demolishing the existing suite down to the core and shell building components. Offices were placed at the perimeter with projecting, small fin-like walls, each with a different coordinating accent..

The Humphrey Nature Center @ Letchworth State Park

The Humphrey Nature Center is a new education facility that serves as a museum, classroom, and general assembly area for Letchworth State Park, which was voted the top state park in the country by USA Today in 2015. While most of funding was through the New York State Parks Capital program, there was a philanthropic..

Buffalo Public School No. 80 Highgate Heights

HHL Architects completed work on the exterior masonry reconstruction, window replacement, and reroofing of the school to remediate any water infiltration into this existing structure. Interior work included patching plaster damage and painting all classrooms. The exterior masonry was tested extensively to determine the path of the water infiltration; it was found that the path..