Category


Commercial

Delaware North World Headquarters

Delaware North World Headquarters

In the late 1990’s, Delaware North Companies (DNC) requested that HHL assist them in reviewing potential Downtown Buffalo building sites for a new world headquarters. DNC selected the unfinished, newly built Key Tower Building. This project consisted of the programming, planning, design, and build-out of the top seven floors to house corporate operations and subsidiaries..

Center for Inquiry Expansion & Renovation

HHL Architects designed an expansion for this research institution providing additional office, seminar, meeting, and new entry spaces. Flexible seminar spaces were designed to accommodate small, intimate meetings, as well as large assemblies upwards of 400 people. Operable folding panel walls were utilized to create flexible volumes for these meeting spaces. A small stage, lighting,..

285 Delaware Office Building

HHL Architects won a design competition for this new five-story office building, located on Delaware Avenue, adjacent to downtown. The owner’s goal was to create a landmark building that transcended the historic styles of the surrounding context, yet would be a contemporary, comfortable neighbor. The building is placed at the sidewalk, while the entrance is..

HHL Architects Office @ 172 Allen Street

This expansion project reflects the firm’s commitment to its location in the National Register-listed Allentown neighborhood. HHL Architects offices were housed in a 2.5 story masonry structure, built as a residence-circa 1860. It was renovated in 1969 as the new architectural firms’ office. The adjacent property, which served as the site of the 2002 expansion..

Consulate General of Canada Buffalo Office Expansion

This project was a multi-phased interior renovation and expansion of high security consulate offices located on the 30th and 31st floors of a 40-story high rise for the Canadian Consulate. HHL Architects provided architectural/interior design services, and mechanical, electrical, plumbing, fire/protection, and hazardous material engineering via subconsultants. Professional services include space planning, phase planning, construction..

Westminster Presbyterian Church: Space Study & Renovations

HHL Architects studied this historic church to assess the utilization of space within the sanctuary/parish hall building as well as the detached former carriage house, now used as an Early Childhood School. Three scenarios were tested which created a new entry point as well as possible renovations to improve circulation and accommodate meeting, office and..

Temple Beth Zion Master Plan & Renovation

Temple Beth Zion, constructed circa 1967, was designed by the New York City firm of Harrison & Abramovitz, while the windows are the work of artist Ben Shahn. The Main Sanctuary building is listed on the National Register for Historic Places and its defining characteristic is the encircling walls composed of ten scalloped panels which..

Erie County Courts: Master Plan & Implementation

HHL Architects prepared a master plan, which included site evaluation, selection, programming, and concept building design for a new County Court Building. The County ultimately decided to use the existing historic Old County Hall campus for the Civil Courts, the Annex (25 Delaware Avenue) for the Criminal Courts, and 77 West Eagle for auxiliary functions...

Theater Place

Theater Place

HHL Architects developed an adaptive reuse design of these two adjacent historic Main Street buildings. This was one of the first mixed-use projects in Downtown Buffalo to initiate the revitalization effort of the Theater District. The design incorporated a multi-level central atrium for circulation and borrowed daylight. Included in the facility were restaurants, night clubs,..

Canisius College Administration Building Renovations

Canisius College Administration Building Renovations

HHL Architects developed renovations and repairs to this former convent, and subsequent high school building, on the newly created north campus of Canisius College. The project included slate roof replacement, handicapped accessibility, exit stair tower addition, as well as exterior brick repairs and renovations to accommodate administrative and development offices. The renovations were designed to..