Read about some of the finalists in the annual Brick by Brick awards whose projects have honored Western New York’s heritage.
BankOnBuffalo
Project: The seventh floor is headquarters for BankOnBuffalo. The Electric Tower is one of Buffalo’s most recognizable landmarks and is listed on the National Register of Historic Places. Built in 1912, the building was acquired by Iskalo Development in 2004 which began a comprehensive renovation and restoration of the Electric Tower beginning in 2006. The seventh floor was the original executive floor for the Buffalo General Electric Co.
Address: 535 Washington St., Buffalo
Square footage: 15,430
Owner: Iskalo Electric Tower LLC
Developer/construction manager/architect: Iskalo Development Corp.
Engineers: IBC Engineering
HVAC: Greater Niagara
Electrical: Brady Electric
Other contractors: Superior General Contracting, Kelley Brothers, ABJ fire protection, Billone Mechanical, Universal Woodworks, Energsmart, DeSprit Marble and Tile
Timeline: August 2018-January 2019
Cost: $2 million
616 Niagara
Project: 616 Niagara is a gateway to downtown Niagara Falls. It is a 3-story, mixed-use project featuring commercial office space and 17 apartments. The ground floor is dedicated to Niagara University’s Niagara Global Tourism Institute and TReC, a business incubator. The 616 Niagara residential apartments are the first high-quality, market-rate rental units to be developed in Niagara Falls in many years.
Address: 616 Niagara St., Niagara Falls
Square footage: 33,700
Developer: TM Montante Development
Owner: 7th and Niagara Holdings LLC
General contractor/construction manager: Montante Construction
Architect: HHL Architects
Structural engineers: Tredo Engineers
Civil engineers: Advanced Design Group
HVAC: Heatwave Heating & Cooling
Electrical: Hildreth Electric
Other contractors: D.V. Brown & Associates Inc., Preservation Studios, Phillips Lytle LLP
Timeline: December 2018-December 2019
Cost: $5.5 million
Read Original Article