HHL Architects was engaged by the building owner to evaluate the problem of exterior staining and water damage on this two-building complex.
Water staining, due to improper drip edges and ledges and water damage to the Exterior Insulation Finish System, due to improper flashing, necessitated replacement of the exterior skin and some of the architectural features. At the same time, HHL substituted certain architectural style choices to make the building a more integrated, cohesive and modern medical office building.